FOOTBALL Samba 2014
It was based on a personal experience and practice, as well as the latest trends and techniques used in the global television industry in Europe, America, Britain and so on.
When the design project was approved, specialists of the scenery department “took the field”. The terms of the game were minimal and the team had 5 only days to achieve a victory, a team of decorators with 12 people coped perfectly with the challenging.
A hit of the lightning department through the entire field of the studio supposed to be brilliant. The lighting department managed to perfectly engage in lighting covering studio devices as 24 static and 40 dynamic instrument of light, well-known brands such as Clay Paky, Martin, ARRI, ETC and more.
Another players who took the field were video department experts, gracefully "hanging" in the scenery center LED screens with record-minimum pitch of 3.92 mm. General area is 20 sq.m. LED and light mesh around the perimeter of the pitch is 10 mm. in the number of 18 sq.m.
The sound technical staff didn`t keep waiting themselves and cared about quality sound in the whole studio.